6 ton steam diesel oil lpg gas boiler

Important preconditions on the 6 ton steam diesel oil lpg boiler flue gas dust removal and desulfurization process design engineering boiler flue gas dust removal and desulfurization project is constantly improving our air quality and reducing acid rain PH value. This article will focus on an overview of the relevant boiler flue gas dust removal and desulfurization project elaboration, analysis related to boiler flue gas dust removal and desulfurization process design engineering, to provide reference for China to improve environmental standards. Overview of related dust and sulfur dioxide in the flue gas dust removal and desulfurization project 1 boiler is the main material damage caused by acid rain and the atmosphere, and it is a form of sulfur dioxide is not a harmful gas has a color and pungent, severe cases can damage the atmosphere structure, resulting in environmental change. Not only that, people living with the process of the production process will produce some harmful dust and sulfur dioxide gas, once the proportion of air in these components is too high it will endanger people's health. But also pose a serious hazard to respect people's productive activities, industrial production, construction and so on. Boiler is an energy conversion device, the input energy to the boiler fuel chemical energy, electrical energy, thermal energy and other forms of high temperature flue gas, and after converting the boiler, the steam output have a certain outward heat, hot water or organic heat . Boiler is one of the main tools of our country's major industrial production, which will use special means to go after some of the energy input material must be converted into energy, in order to adapt to the development industry. But in the course of the boiler will emit harmful substances, although it will increase the efficiency of economic and industrial development in a way, but also bring a certain degree of damage to the environment, severe cases can endanger human safety. Current coal resources and consumption of oil resources gradually increased, resulting in dust emissions and sulfuric acid type gas also increases. So our national government to protect the environment but also introduced the corresponding countermeasures, continuous improvement boiler flue gas dust removal and desulfurization process design engineering methods to improve its environmental efficiency. Flue Gas Desulfurization relevant principles of the boiler 2 into the operating principle of this embodiment 2.1 magnesia mainly refers to the use of a slurry containing MgO as a desulfurizing agent in the wash, MgO is converted to magnesium sulfite (MgSO3) and magnesium sulfate (MgSO4), the sulfur is then removed from the solution. This approach boiler dust desulfurization more mature and has been widely used in Japan and Taiwan and other regions in mainland China also has many factories, dust removal and desulphurization work in this way. Moreover, this method of dust removal and desulfurization efficiency above 90%, help protect the environment, improve the current air quality. Also in the case where the like, the amount of magnesium oxide with calcium carbonate Desulfurization only two fifths, this method shows a high utilization of raw materials, and the effect is more obvious. Currently stored amount of magnesium oxide in our country up to 80 billion tons, ranking first in the world in mining technology is also more skilled, and therefore has a considerable edge for our country. 2.2 works swirl plate absorber tower for flue gas desulphurization dust from the boiler is first enters the venturi tube, for spraying a primary dust desulfurization treatment, and then a flow rate of 15 ~ 22m / s is tangentially into the swirl plate column cylinder, firstly by the action of centrifugal force, thrown large particles in the flue gas to the tower wall, and a top-down flow of the absorbing liquid trap. This method enables the boiler flue dust separated from the gas, and to achieve the object of dust removal and desulfurization. 3 boiler flue gas dedusting flue gas desulfurization process design inside the boiler through the heat exchanger after the dust removal device into efficient desulfurization device or directly into efficient desulfurization and dust removal device, and then use the exhaust chimney draft fan. In the dust removing device which will produce gray water tank into the lime, a process using sodium lye bath kinds sodium lye, then became lime mud. If there is still the use of multi-level gray water and sludge pump liquid precipitation treatment, after diluting the high water level of the pool can be completed. Therefore, in the boiler flue gas dust removal and desulfurization process engineering design process to rational design exhaust system, flue gas purification systems, precipitation systems, inspection systems, power systems, and infrastructure-related aspects. And actively improve the quality and level design to ensure that the results of the boiler flue gas dust removal and desulfurization national environmental standards in line with the relevant departments to develop. In the process design process should also consider the cost of construction of the whole project, detailed estimates of its economic benefits and social benefits. In the course of implementation should strengthen supervision and management, to improve the quality of the environment and efforts. 4 Conclusion With the improvement of scientific and technological level of China's industrial development speed greatly accelerated. But in the process of industrial development often will use some of the energy resources, such as coal resources, oil resources and other aspects of chemical materials, use of these resources in the process will produce some waste is not conducive to environmental sustainability. Therefore, the relevant enterprises and departments should actively improve the quality of the boiler flue gas dust removal and desulfurization, improve the rationality of engineering process design, lay the foundation for improving the economic and social benefits. This requires the joint efforts of government departments and enterprises, the only way our country's socialist market economy to be able to achieve sustainable development goals, to be able to improve the economic benefits of the greatest degree.

Tai Chi, Jiaozuo City, Jiaozuo City Sports Center is one of important sports infrastructure, a total area of ​​11.73 hectares, held several international events. With strict management in Henan Province for air emissions of pollutants, Jiaozuo City, also launched the governance of coal-fired 6 ton steam diesel oil lpg boilers, thermal power and other equipment. Jiaozuo Sports Center actively cooperate with municipal workers, took the lead from coal to gas activities, the serious pollution of the original extent of coal-fired boilers to replace gas boilers. Gas boiler cleaning binding understanding of the market, to achieve cooperation with the finalization fast boiler by providing a fast side 2.8MW integrally condensing gas hot water boiler (WNS2.8-1.0 / 95/70-YQ), it is used to Sports Center provides heating and hot water.

Multiple protection devices take you through the oil steam 6 ton steam diesel oil lpg boiler oil steam boiler water level protection, boiler water level gauge plate supporting one to two, should always be compared with each other, findings indicate inconsistency shall be corrected immediately. Class water level should be flushed, to determine their true level. While the water level comes electrode rod can accurately capture level signal to an alarm or a pump control. Steam pressure protection, the pressure controller: selection of high sensitivity of the pressure controller, the pressure is high, or low levels of signal to the electrical switches, automatic control chain protection or other control lines. Using pressure controllers and electrical contacts, the vapor pressure can overpressure alarm; single adjustable pressure controller or dual fire burning fire the actual operating pressure. Safety valve: safety valve is the last line of defense to protect the boiler, the boiler pressure exceeds the limit, according to the set pressure relief valve design with the school, the exhaust steam pressure relief, to ensure the normal operation of the boiler. Flame protection, having imported burner flame protection means, combustion function is to detect, when the ignition failure or extinguish combustion middle, immediately off the burner into the oil (gas) solenoid valve, the blower continues to operate at this time, the furnace was purged of residual internal combustible gas, after 20 to 30 seconds purge, and various auxiliary blowers automatically cut off power, the boiler operation stops. Self-locking power protection case, the boiler shutdown immediately burst self-locking power interruption, if the current power is restored, the boiler will not start at any time, you must reset release self-locking, to re-start the ignition.

Steam 6 ton steam diesel oil lpg boiler rules Henan fast boiler with small series to introduce the company's steam boiler operating procedures. First, the components of the steam boiler before oven cooking oven and check (a) and oven cooked boiler furnace must be checked in detail. Check the following items: 1, cold chain grate test more than 24 hours, cold test should meet the following requirements: (1) grate should be smooth turning chain wheel axle, found arched, two tension bolts can be tightened. (2) the active grate sprocket good occlusion. Minimum gap (3) on both sides of the active grate block with the side seal and the side seal angle not less than 6 mm. Distance (4) on both sides of both ends of the furnace grate platoon leader pin in the sprocket should be kept equal. If it is found at one end to the occurrence of side friction, long waist-hole may be a tap with a hammer, the end surfaces on both sides remains equal distance. (5) steam boiler grate rotated without jamming, deviation phenomenon, when the deviation found by the inspection hole into the rear grate tail, the tie bolt align the two bearings of the drum, deviation phenomenon can be eliminated. The boiler has ignition combustion, still need to transfer found Hearth n, just before two adjustable chain tensioning bolt shaft directly outside the furnace, but preceded align the front sprocket shaft and a gearbox connect the safety pin or bolt removed until after squaring shaft to a gearbox with a chain alignment pin or bolt after tightening, may otherwise result in misalignment with the sprocket shaft of a gearbox and mechanical damage. (B) Check broken grate furnace platoon leader pin is bent, if long waist hole in the furnace may be carried out at any time platoon leader pin alignment reload. (C) a chain grate does not allow foreign matters (such as bolts, nuts, nails and other iron) is present. (D) firing door open and flexible, easy to open and drop the shutter coal, coal gate left and right side of the grate surface distance equal to, the thickness of both sides of the seam to ensure equal furnace, as a method for reducing ranging from links available to make equal, coal shutter cover plate should cover tightly to prevent leakage into the coal, coal stuck shutter. (Five) of each grate windshield of smoke damper and damper adjustment inside the flue flexible switch. (Vi) blower, Fan, Java machine, commissioning normal water supply equipment. (Vii) manhole, hand hole is tight, attached parts fitted Ge are complete. (Viii) the furnace wall is normal, the flue is tight. (Ix) steam boiler pipes, water pipes, sewage road is complete. (J) all filled with lubricating oil in the bearing housing and oil cup. (Xi) All electrical equipment should be empty running test, inspection equipment, and other electrical lines is intact.