4000kg per hour horizontal electric steam boiler

Precautions steam boiler used below Henan fast boiler with small series to introduce the company's attention to the point of steam boilers. Steam boiler safety knowledge: the need to view certain parts of the system for leaks, gas boiler should detect faults and repair, in order to avoid too much fresh water oxidation and expansion will accelerate system operation. Water heating system must be used for a long time is not empty, cut off the power, gas, water, among other factors. Check the electric connection is loose, aging, leakage protection switch is normal. Check the gas pipes in good condition, if there is an air leak. Steam boiler during the heating state of the internal combustion engine automatic start control, when the need to check the operating state of the machine, the state of the combustion flame, temperature changes, are likely to clog the filter. If, during boiler operation you smell gas, you must shut off the gas valve, quickly open the doors and windows, air circulation, and then request a professional service.

About Code of Practice Code of Practice for the safe operation of the hot water boiler hot water boiler hot water boiler safe operation because of its specificity required safety practices. Understandable that the normal life and production are inseparable from the use of the hot water boiler. How hot water boiler safety issues need to be protected? 1, carefully check the work before the hot water boiler, drainage, gas pipe fittings, safety valve, pressure gauge, water level, is sensitive so that, after confirming it is safe to operate. 2, with both hands to manipulate when Sheung hand to open the door of water, whereupon the other hand the water injector and valve open, the water naturally into the furnace. When stopped, the steam valve should be closed first, then turn off the water door, switch and valve, the front face must escape to avoid soft drinks out of the accident. 3, hot water boiler in operation, inspection departments to pay attention to observe the pressure and water level. Fireman are not allowed to leave their posts without permission, when night work, avoid dozing off, more sleep deprivation, in order to avoid accidents. Hot water boiler blowdown, must be performed once per shift, adjust the water level in the sewage before, slightly higher 2/3, followed by sewage. 4, the water level table class must be flushed once. When flushing, according to established procedures, the first closure valve and open the drain valve, flush valve steam, steam at this time pay attention to the origin is blocked. Steam valve is then closed, when attention is blocked antecedents water. Flushing valve, until the water becomes steam, some a little longer, in order to guarantee no false water level. Hot water boiler coal must be checked, to prevent coal detonator explosives and other explosives thrown into the furnace, to prevent the risk of explosion. 5, to always check the temperature of the motor housing and the machinery, such as mechanical failure or an electric motor with a fever more than 60 degrees, stop testing immediately. Hot water boiler normal operation, the vapor pressure shall not exceed the operating pressure, the safety valve inspection once a week.

Fuel gas steam boiler safety and the prevention of fuel gas steam boiler is the flagship product, installation and after many years of production experience, now a comprehensive summary of the accident prevention measures gas boiler fuel and steam to share: fireman who must operate by the quality and technology supervision department issued the use of a registered boiler. Fireman who operate independently of the operating permit required to hold a fireman, and you meet the operational requirements of furnaces and categories. Boiler ignition should be done before the body of the boiler, burners and other auxiliary equipment, all attachments, valves, water supply, gas supply system and the electric control circuit inspection departments, and confirm normal. Play an open air valve, water to the pot water level slightly lower than normal water level. With "manual" to start the fan, the furnace was purged, the control system is adjusted to "auto" position, and then press the "start" switch, the boiler will be according to a predetermined program: Purge - Ignition - combustion - temporarily shutdown. Such as a faulty ignition program, fans can continue to manually purge and re-ignition, such as three unsuccessful ignition, to cease firing and gas, to identify the cause of the fault elimination, in order to re-ignite. When the pot was raised slightly greater than atmospheric pressure, the air valve has steam coming, can close the air valve. Requirements fuel gas steam boiler boost process, according to the provisions of checks and do all the operations carried out in order to confirm or steam supply and the normal furnace. After normal operation, you should always adjust the air supply, air supply and water supply, to maintain the water level and pressure stability, the need to adapt to the load, to ensure that the steam supply. Operation inspection checks should be carried out once every hour, and carry out all the provisions of the recording, check to confirm the name. Class should be flushed sewage water table and each time, the exhaust valve test, pressure gauge should be required to flush the requirements of the trap and check the safety devices perform, record and fill in, sign name recognition. First stop during normal shutdown supply, air supply is stopped later, to keep the water level above the normal water level. Fuel gas steam boiler furnace and flue gas boiler explosions are common in accidents.

Shandong Mining Group in the six months after the boiler use, users submit a report to our company, our company started in 2017 using WDR0.5-0.8-Ⅱ electric fast Boiler Co., Ltd. of heating steam boiler. Large output, stable and reliable, high degree of automation, simple operation, do especially in terms of security is in place. After-sales service is very timely response to our technical consulting reply quickly and accurately. Whether it is party party products or fast fast service. My company is very satisfied. --customer feedback