ibr boiler manufacturers india for ahemedabad

How to prevent the ibr boiler manufacturers india for ahemedabad furnace coke? In order to prevent the boiler coking, on the run may take the following measures: (1) a reasonable adjustment of combustion. Flame distribution in the furnace, the flame is not deflected center; (2) to ensure the proper amount of excess air, to prevent combustion hypoxia; (3) to avoid operating the boiler load exceeds the force; (4) ash periodically. Ground inspection found that fouling and coking village promptly removed. In terms of maintenance should be done: (1) improve the quality of maintenance, to ensure accurate installation burner; the boiler (2) maintenance tightness better, to prevent air leakage.

February 20, 2019, the Beijing Municipal Government issued the "Beijing's pollution prevention campaign of 2019 Action Plan" (hereinafter referred to as the "Action Plan"). "Action Plan" clearly 2019 development goals: the first is the city PM2.5年均浓度, three-year moving average concentration strive to continue to decline.

Since 2018 autumn and winter, fog and haze in control efforts continue to increase. Beijing, Tianjin Fenwei Plain, the Yangtze River Delta region of the focus of supervision and maintain a high pressure situation, provinces and cities have also introduced Blue Sky Battle plan, air pollution control sector welcome the opportunity. And because the 2018 autumn and winter abolition of green "one size fits all", so that pollution from the administrative means to switch to environmentally friendly means to speed up environmental protection business orders release.

"Winning Blue Sky Battle three-year action plan" called for increased efforts to eliminate small coal-fired boilers, the county level and above urban area basically eliminated 10 tons of steam per hour and coal-fired boilers, in principle, to the new 35 per hour tons of steam coal-fired boilers. We believe that, under constant fog and haze, the small boiler phase-out process will accelerate. Research believes that by 2021 the transformation of coal-fired central heating investment 88.6 billion yuan, annual operating income of 240 billion yuan, the central heating market will also speed up the release with the environmental supervision.

Professionals expect non-electric air control about 192.2 billion market space, ultra-low emission thermal power market reform space of about 65.7 billion yuan, the whole vast air pollution control requirements.

In addition, the high diesel vehicle emissions, is also one of the main source of haze pollution. Considering the number of ministries had jointly issued by the Ministry of Ecology and environment "diesel truck pollution control tough fight Action Plan" diesel vehicles, boats become the focus of the next step of action to win the Battle of the blue sky.

When operating the ibr boiler manufacturers india for ahemedabad, what is the "waters"? When the boiler water gauge did not see the water level, wash first with water table method to determine water or with water. If it is determined that water, water level meter for even the highest fire tube boiler is lower than the boundary, emergency shutdown immediately, reducing the furnace temperature, the main steam valve and to close the valve. For larger capacity of water, and the water boiler higher than even the highest fire tube boiler industry, can be "called water" method to determine the severity of water shortages, in order to take appropriate measures. When the "waters" to determine water shortage is not serious, it can continue to the boiler feed water, the water level returned to normal, gradually warming up to start burning equipment, boost operational. Through the "waters", sentenced to severe water shortages, have emergency shutdown, non-blind feed water to the boiler. Never allow chances attempt to cover liability resulting boiler water shortage and water supply blind. This wrong approach often lead to disaster, expansion of the accident, causing the boiler furnace explosion and crash. The method of "waters" are: (1) turn on the water tap open water table. (2) stripping off cock. (3) close the water cock. (4) and then turn on the water tap is closed. (5) and then turn the tap water, to see whether there is water out from the water pipe is connected. If out of the water, the water is slightly; if no water appears, proved to be a serious shortage. "Waters" process can be repeated several times but not delay too long, so the expansion of the accident. "Waters" principles of operation are: After draining cock open, then close the steam, the water pipe connected between the water cock and the table, so that a large vapor communication with the water table, water gauge pressure is zero. Then again closed drain cocks open water pipe connected between the water cock and the water table, because the pressure within the drum water level higher than the inner pressure table, if the drum water level is in the vicinity of the water pipe connected to the water vapor stream is brought into water table, which shows the extent of water shortage is not serious. If the "waters" has never been in the water table level, water is considered more serious.

The body price of a 10-ton szl series chain grate ibr boiler manufacturers india for ahemedabad with a pressure of 1.6 MPa is about $80,270. If auxiliary machines such as valve meters and economizers are added, the total cost is about $131,350. The body price of a 10 ton szs series natural gas boiler with a pressure of 1.25 MPa is about $65,649. Together with various auxiliary machines such as burners, the total cost is about $150,789.