top rated practical steam boiler for concrete blocks

Causes and treatment of electric boiler fire 1 which, the powered electric boiler on flammable or near inflammables, fire baking at a high temperature for a long time. 2, electric boiler is not installed plug directly into the socket end of the wire, thereby easily cause a short circuit and fire. 3, the user does not unplug the plug of the electrical boiler when leaving, too long, resulting in electric boiler superheater, the adjacent fuel ignited and cause a fire. Fourth, after repeated repair continue resistance wire, may cause overloading fire line. Precautionary approach to solve the electric boiler fire: 1, plug wires must be installed, the thread can not be directly inserted into the socket; electric boilers should be replaced old and damaged wires, electric boiler circuit is not installed fuse may not be used; 2, when the electric boiler must be used left unattended, should be left unplugged, during use, the case of power failure, it should promptly pull the plug, do not forget. For the repair of multiple resistance wire, preferably no longer in use, should be replaced with a new resistance wire. Electric boiler must be placed on the thermally non-conductive non-combustible material of the base; 3, the cross-sectional flow boiler safe electrical wires must meet the capacity requirements of electric boilers, industrial boilers separate electric circuits in any case be means.

To further reduce emissions of air pollutants and improve air quality of the environment, the Shanghai Municipal People's Government Office issued the "Opinions on accelerating the transformation of the city mentioned standard boilers of small and medium" (hereinafter "Opinion"), to accelerate the introduction of Shanghai City small boilers mentioned standard transformation respond positively.

Before the end of 2018, the district in conjunction with boilers and industrial distribution block, complete the development and revision of the Gas Pipeline Network Planning in this area. City, district authorities, according to the unit Gas Pipeline Network Planning and excavation plan, speed up the construction of natural gas pipeline network.

Variety of boiler fuel to replace natural gas, natural gas pipeline network (municipal pipe network to users outside the red line pipe) 50% of the cost of laying borne by the gas company; the remaining 50% by the district government and users each pay half, and encourage qualified district to provide more support. On the outskirts of the gas pipeline construction is temporarily unable to reach enterprises in the region, while ensuring security compliance cases, it can be in the form of non-natural gas pipeline, and implement an orderly transition after the completion of the pipe network. Encourage alternative gas supply business enterprises to provide gas price discount for the gas boiler.

10KV for the implementation of alternative electric boiler, 35KV and other business expansion project, to which the power supply capacity of the electrical part of the boiler, according to the city's non-resident business expansion project quota standards, engineering fees charged by half.

Environment departments to strengthen law enforcement and inspection of boiler units, fuel use, operation and maintenance, equipment maintenance, inspection, non-functioning facility once found, according to the law severely punished; at the same time, strengthen supervision and monitoring, if it is found excessive emissions, according to law strict punishment.

Boiler units and boiler mentioned standard transformation service units bear the main responsibility for the boiler safety issues involved. Site construction unit must have the appropriate boiler manufacture or installation (reconstruction) qualification, boiler commissioning personnel must have the appropriate special equipment operator certificate. Prior to the construction site mentioned standard boiler units to implement the transformation, boiler location should be informed in writing of special equipment regulatory authorities.

The district government is the responsibility of the main boiler to mention the transformation of the standard, according to the "ground principles" to promote the transformation of the boiler. Combined with the actual circumstances of the district reform implementation plan, accelerating the construction of facilities to ensure timely completion of the task of transformation, to ensure that policies and financial support in place.

75 ton coal fired boiler can create abundance steam during its working process. ZG company has more than 70 year coal fired top rated practical steam boiler for concrete blocks manufacturing experience. We make sure each step of 75 ton coal fired steam boiler are strictly following ISO9001 standards. Good performance 75 ton coal fired steam boiler can enhance the working efficiency of each power plant.

How should determine gas top rated practical steam boiler for concrete blockss have less water phenomenon? When the minimum level is less than the water level already defined, but still see the water level in the observed water level meter, is determined mild water; when the water level is less than the water level gauge visually determined to severe water shortages. The phenomenon outlined listed below: (1) drum water level is less than the normal water level defined; (2) low water alarm, automatic alarms sounded, signal light; (3) the superheated steam to increase the temperature of vapor; (4) the amount of water is not normal, below the steam flow rate value; (5) increase the temperature of vapor smoke emission.