packgae coal fired steam boiler

Fuel type: natural gas, biogas, lpg, oil, city coal gas, light oil, heavy oil, disel oil

Rubber can be seen everywhere in life. There are more and more rubber products in the industrial sector. There are many varieties and wide applications. The main products are tapes, hoses, gaskets, rubber rollers, rubber sheets and rubber linings. Labor protection products. For rubber plants, boilers are a very important configuration. Rubber companies use steam generated by steam boilers. The rubber article can be vulcanized by a vulcanization apparatus to change the rubber article into an elastomer. Customers should choose the right boiler according to their own needs.

How many calories Horizontal one ton packgae coal fired steam boiler needs? 1 ton steam boiler, require 600,000 calories, biomass is the most economical fuel. 1 t of steam boilers, 600,000 calories needed, is converted into fuels: diesel 58kg / hour, i.e. cost of diesel and 466 / hour; biomass particles 150kg / hour, the cost of 165 / hour. 697 electrical degrees / hour, i.e. cost of electricity 697 / hour; gas 75m3 / hour, i.e. cost of natural gas 375 / hour; 120kg of coal / hour, i.e. cost of coal is about $ 120. As can be seen from the above, coal and biomass particles are the most economical. Wherein the combustion of coal is difficult to control, and the actual consumption costs considerably biomass particles. However, polluting coal boiler is very large, and the biomass boiler is both economical, and environmentally friendly. Accordingly, we can see that biomass pellet boiler is the best future direction of development of the industry boiler, the boiler will also become the industry mainstream.

Central heating hot water boilers for heating in winter is an important measure in most parts of China. Hebei Guan China Fortune Foundation Limited mainly engaged in real estate projects, is a leading industrial town operators. Heating service is primarily aimed at the Group's residential housing and other real estate. With the full open sky Battle, continue to improve the proportion of clean heating, heating for the implementation of clean energy, China Fortune Foundation to purchase much-needed high performance hot water boiler clean and green products. After comparing a number of boiler plants, the best of the best, determined to cooperate with the fast boiler in abundant clean energy R & D experience in boiler party. Providing fast boiler SZS Series 2 gas hot water boiler according to the actual needs, respectively 58MW and 29MW.

Shutdown four tons of gas boiler packgae coal fired steam boiler shutdown and maintenance of fire into pressure shutdown, normal shutdown, emergency shutdown. A pressure fire fire shutdown shutdown pressure applied to temporarily stop the supply of steam, the boiler is shutdown pressure hot standby state. 1, before the pressure reduction appropriately to fire the boiler load, and according to the length of the seam thicker shutdown time, (up to 200mm) to accelerate the speed of the grate, the grate is stopped when rotated about 1.5 meters from the coal seam to the shutter. 2, stop blowers, blower suitably adjusted flap subsections, relying on a lean-burn natural ventilation is maintained. 3, the sewage, to allow the water level in the boiler water level. 4, Yang fire regularly, to prevent rotation of the furnace grate extinguish the fire bed. Young fire first before sewage water, then rinse water level gauge. II. Normal shutdown Normal shutdown for heating period ends, boiler pour fire into the buck repair or maintenance. 1, make a record before shutdown problems in operation, so that after the shutdown process. 2, the coal bucket coal memory runs out, the amount of toner to reduce the wind. 3. Stop the blower, draft fan stop and then the opened door grate ash. 4, after the steam supply is stopped out, the boiler to the boiler water to maintain a high level. 5, close the main steam valve, if the pressure rises to open the air exhaust valve suitable pressure relief. 6, stop the water supply to the boiler and economizer attention to monitoring changes in water temperature, open return pipe if necessary. 7, 4 to 6 hours after the furnace fire bed down exhausted, continued rotation of the cooling grate. Throughout the boiler throttle, the door should be kept closed. Allowed to naturally cool. 8, appropriate to open the pump, the boiler water and sewage. When the pressure drops to zero, open the air valve. 9, when the boiler water temperature is below 70 ℃, boiler water can be exhausted. Shutdown is complete. 10, less than 24 hours during shutdown. Avoid Shutdown cooling process, step-down too fast. Third, emergency shutdown emergency shutdown applies to the boiler accident, g combustion equipment damage, furnace or boiler structure collapsed wall is red-hot, a serious threat to the safe operation of the boiler when; h boiler pressure parts found serious distortion, leakage. when i found flue gas explosion or secondary combustion, boiler and seriously endanger the safety of operating personnel;; when endanger the safety of operation.. the safe operation of the boiler j endanger other unusual circumstances when. 2, the emergency shutdown procedures to immediately stop a blowing coal and reduce the wind; B rotates quickly grate, the pour slag pit coal or sand, wet ash coal burning fire to extinguish. , but not to the firebox water;. c boiler air valve, the relief valve opens quickly exhaust the steam pressure is reduced;. d after the fire goes out, stopping fan, opening the ash door and door, promote air circulation accelerated cooling; 3, emergency shutdown Notes a. when an accident and emergency shutdown due to lack of water, boiler feed water is strictly prohibited to, and shall not be such as to open the air valve or exhaust valve work on preventing boiler from sudden changes in temperature or pressure to expand accidents;. b when filled with water due to an accident and emergency shutdown, should immediately stop the water supply, reduce combustion, open the drain valve and drain, due to lower the water level, while opening the main steam pipe, the sub-cylinder and steam traps mother tube, water and prevent steam pipe with a large number of water hammer occurs. c. emergency shutdown operation to ensure the safety of the main event of an accident to calmly deal with, timely reporting, and make relevant records in the "log table boiler." d. Whether shutdown any case, we must maintain timely contact with steam departments.