double wall milk boiler

The rated output of the double wall milk boiler and boiler efficiency is determined, the fuel consumption is calculated, and then selected according to power a single burner arranged to determine the number of burners. Increase the number of burners, in favor of the atomization quality assurance wind oil mix, but too many, and not easy to operation and maintenance, will give burner arrangement difficult. Adjusting the burner to a large extent, be able to adapt to changes in boiler load, to ensure complete stable combustion under different conditions.

How much of a natural gas double wall milk boiler? Boiler prices, the problem is each user in the purchase of equipment first consideration, which would allow the cost of inputs is more clear. For gas-fired widely used in recent years to start, too, and now the price of natural gas boilers on the market vary, many users purchase will be feeling confused. This is mainly due to the price factor in the region, equipment, materials, production processes, etc. caused mixed.

Henan gas double wall milk boiler installation requirements for the gauge 1. Pressure gauge installation should meet the following requirements: ⑴. Henan gas boiler installation position gauge, should be easy to observe and rinsing, the dial should be tilted forward 15 °, and should prevent affected by temperature, vibration and the like freezing. ⑵. There should be a trap between the pressure gauge and gas-fired boiler drum Henan. Steam or hot water in which the spring and then into the cooling pipe, to avoid reading errors caused by high temperatures, even damaged parts in the table. The inner diameter of the trap, with the brass when not less than 6mm, when using steel not less than 10mm. A lower portion of the trap, preferably equipped with drain cocks, water to let go of the tube after shutdown. ⑶. It should be fitted between the water gauge and the three-way stopcock elbow, and to flush the pipeline inspection, check, unloading gauge change. a. When normal working pressure gauge, Henan gas boiler media through the trap and pressure gauge connected, the pressure gauge pressure boilers. b. Check the pressure gauge, Henan gas boiler and pressure gauge cut off, the pressure gauge to the atmosphere, because there is no pressure in the table, so if the pointer back to zero can not prove that the gauge has failed and must be replaced. c. When flushing the trap, Henan gas boiler with the atmosphere, with the pressure gauge cut off, the trap in the water and dirt, the boiler blowing in the media. d. So that when water in the trap, the trap and the air pressure gauge are cut off, Henan gas boiler steam or hot water is gradually accumulated in the trap was cooled. e. When checking pressure gauges, while communicating with the boiler working pressure gauge and check the pressure gauge. Standard gauge calibration connected with the flange on the left side of the three-way cock, the medium from the working pressure into the trap and simultaneously checking the pressure gauge. Pressure gauge indicates the two values, the difference shall not exceed the gauge tolerances specified otherwise, the work proved inaccurate pressure gauge, pressure gauge must be replaced. Three-way stopcock handle end portion, the plug must be marked with an arrow indicating the direction of passage in order to identify. When the three-way stopcock operation, action to slow, to avoid damaging the gauge parts. ⑷. Even if long tube pressure gauge, the valve can be installed (or cock) close to the connection pipe at boiler drum Henan gas for use in the maintenance of the cutting gauge and accessories. However, in operation, the valve must be loaded (or tap) the hand wheel (or handle) Remove or lock to prevent accidental off and cause a major accident. 2. When the pressure gauge of the following circumstances, should stop using: ⑴. Limited nail no pressure gauge, the staple rotation pointer does not return to the limit; not limitation staple no pressure gauge, a pointer value from the zero position more than a predetermined tolerance gauge. ⑵. The surface of the glass or ambiguous dial scale. ⑶. No seal, the seal is damaged, or the Verify the expiration date. ⑷. In the table pointer leaks or beating. ⑸. Other effects gauge accurate defect.

To proceed from reality, should be in accordance with the electric power, gas should the gas, the coal should be coal, should be hot the thermal principle, promote the use of all kinds of clean energy for winter heating cleaning. In order to reduce air pollution and protect people's warm winter as a foothold to enterprises, government promotion, residents can withstand the principle of gas after the first change to gas will change in gas assurance, the price is acceptable on the basis of sound promote the "coal to gas" and central heating engineering, in district heating supply pipe network can not cover, vigorously implement the replacement of coal-fired power heating project.

Good job of marketing system storage capacity for natural gas. Accelerate the construction of natural gas transmission and distribution network, the new natural gas volume priority for life and severe winter areas of urban air pollution and coal for heating alternative. In principle, to new natural gas cogeneration and gas chemical projects.

Accelerate agricultural and pastoral areas "coal to electricity," the process of upgrading the power grid. Coordinate development of power transmission project construction, etc. are encouraged to promote the regenerative electric heating. Around on the "coal to electricity" project supporting grid should be given support, coordination "of coal to electricity," "coal to gas" land for construction.

In accordance with national requirements, shutting down environmental protection, energy consumption, safety and other 300,000 kilowatts coal-fired units of non-compliance. For shutting down the unit's capacity, coal consumption and emissions targets, allowed to trade or replacement, can co-ordinate arrangements for building the capacity of ultra-low emission coal-fired units.

According to air quality improvement requirements to accelerate the delineation of high-pollution fuel combustion zone ban and to expand the scope of, and actively promote the elimination of small coal-fired boilers. The county level and above urban area basically eliminated 10 tons of steam per hour and coal-fired boilers and tea furnace, stove and other operating coal-fired facilities, in principle, to 35 tons of steam per hour, the new coal-fired boilers, in principle, other areas on no new 10 tons of steam per hour of coal-fired boilers. While banned out of coal-fired boilers, pressure boilers market regulators cancellation of registration certificate to use.