biomas boiler jute fired steam boiler

The reason of boiler scaling is that the water supply contains calcium magnesium hardness or iron ion and the silicon content is too high at the same time because of the special conditions of high temperature and high pressure of boiler. The main processes of scale formation are: 1 thermal decomposition

Maintenance and repair of biomas boiler jute fired steam boiler method every customer wants to buy a durable good steam boiler Di, we provide the best quality Di boiler manufacturers are on the one hand, on the other hand the needs of each user can carefully Di maintenance and maintenance of boilers, improve the life of the boiler to make steam, Di to bring you more value in return! So, how to care and maintain it, the editor based on years of experience, special summarized as follows: First, the first maintenance, water supply must be a qualified treatment, water temperature should fight with the furnace temperature close to, preferably above 20 ℃. Secondly, the need for regular low water cutoff apparatus for inspection, cleaning. Water Level Controller cleaned at least once a month, rinse water table at least once a day. Rinse water table should be at the highest level; but also for the sewage operation, at least once a day, after the sewage drain valve should be checked because of possible contamination and leaks; if it must be excluded. When there is no shutdown and the steam pressure, the steam space of the boiler and air entrapment generates a negative pressure, should rise again to the fire burning total steam valve is opened. Meanwhile, when the smoke tube fouling, so that the exhaust gas temperature will increase, thereby reducing the efficiency of the boiler, the fuel consumption increases, it should periodically open the front door, brushing or blow smoke tube fouling. Second, anti-corrosion First, after the shutdown, the pot to prevent corrosion, maintenance needs as soon as possible. If the short-term care, then, can be used wet regimen; i.e. after the shutdown, the water fill the furnace, the air discharge all. If the long-term maintenance, then the maintenance of law can be dry, that water off the furnace after shutdown, open the lower hand hole, dry water pot, and through the lower hand hole, put a drying agent, and should be changed regularly , can start a monthly check and replace; times can later be three months. It should be noted, before the boiler is enabled, be sure to remove all desiccant. Third, the first maintenance, boiler operation, every one hour to conduct an inspection apparatus, the focus operation member and the rotary boiler safety checking apparatus. Secondly, inspection, testing and regular operation of the project cycle, make specific provisions and loading site as an icon. Again, operating personnel records based on timely completion of the inspection. Finally, the site must be kept clean, so that no debris, no fouling, no water, no grease.

So, what it is the cycle arrest? Cycle arrest refers to the same cycle, the rising pipe due to uneven heating conditions in parallel, where the heated weak soda mixture density greater than the case of strong heating soda mixture density, resulting in more heat downcomer weakly reducing the flow tube, even stagnant, this is cycle arrest. Ascending vapor can not be taken away, it will lead to overheating of the wall, whereby the squib, the use of hot water boiler must be able to ensure that each of the tubes are heated uniformly, but also to ensure the downcomer uniformly to the waterwall tubes for water distribution, so as to ensure smooth water circulation.

During installation, the technical team fast boiler plant according to the specific needs of our environment, our rational arrangement of stacks, pipes, and other auxiliary equipment, let us bring a lot of convenience in the latter part of the course. Fang fast responsible attitude also gives us impressed, sent a technical team for installation, commissioning and training to us, let us rest assured, peace of mind, peace of mind. --customer feedback