foam products natural gas hot water boiler manufacturers

Fangkuai Group has more than 60 independent intellectual property rights, advanced clean fuel boiler manufacturing technology, and jointly established a clean fuel boiler production, research and research cooperation base with Tsinghua University and Xi'an Jiaotong University. An enterprise with a R & D and test center for clean fuel boilers. The thermal efficiency of “Fangkuai” boilers can reach 107%, which has been included in the national special equipment energy-saving catalog. The company developed ultra-low nitrogen full premixed combustion condensing boilers and ultra low nitrogen emission fuel gas boilers, which are developed by the company using Ultran condensation technology.

What if there is wear and tear in the natural gas boiler? Detailed inspection is the key, as is fuel management. According to the operation condition and time of natural gas boiler, we can plan reasonable wear inspection. When using fuel, we strictly control the granularity of coal and limestone. The size of bed material should be strictly controlled. Boiler waste should be disposed of. The waste residue of the boiler must be treated before it can be discharged. Natural gas boilers should be installed where heat is used, easy to install. The hot pipe should not be too long. It should have a good insulation. The pipe shall be tilted properly from the hot water outlet to the end. The water supply source shall be equipped with a control valve. To discharge exhaust gases, the chimney of the natural gas boiler should extend to the outside and the outlet should be 1.5 to 2M higher than that of the boiler. If we want to reduce the influence on the water wall tube, we can adjust the air pressure and air volume properly, and effectively reduce the wear of the water wall. Check time is usually standby or downtime. Items to be examined include wall wear, furnace sealing and smoke leakage. In case of wear and tear, repair and welding are required to ensure the normal operation of steam boiler. Generally speaking, before combustion of natural gas boilers, fossil fuels, fossil fuels and bed and circulating materials should be filled in the combustion chamber at wind speed and strength. And stiffness of the air convection under full integration. Furnace bottom air device, inner core area upward. The movement in the outer ring region flows downwards along the water wall of the furnace, thus prolonging the residence time of the coal particles in the furnace. Mineral particles, a large number of ash powder and smoke contain a large number of fly ash particles, these continue to lead to rapid wear of water-cooled wall tube, make wall thickness wear thin, resulting in wear.

The importance of the power plant boiler control systems and boiler room design load Description: This important site for boiler products and key words, because it is inclusive of all of the Website, so, in order to help people to learn their work from different angles, below, the boiler will start from the whole to expand and be specific, in the form of learning, in the form of questions and answers will be used to ensure that everyone's learning. 1. boiler feed water and boiler feed water, these two are the same? Boiler feed water and boiler feed water the two, although the name, only a difference of a word, but they are not the same, because, boiler feed water refers to the water softener after chemically treated, and boiler feed water, which is from the chemical water workshop to between oxygen, and then through the feed pump into the economizer of soft water, which is in the process compared to the boiler feed water, but also increase oxygen and heating these two operations. So, to sum up, they are not the same. 2. The power plant boiler combustion control system in which it important? In the boiler power plant, it can be said, combustion control systems, it is very important to a system, because it is in the boiler master control system, therefore, will have this conclusion, therefore, on this issue, their answer Yes. Further, the configuration in which the main fuel is a control system, air flow control system and furnace pressure control system of the three parts. 3. coal, oil or gas boilers, boiler room that is, the need to build an independent?

Three tempering tube foam products hot water boiler manufacturers installation and commissioning of the structure outlined hot water boiler is fast loading of the internal combustion level. A second high temperature flue gas successively washed roots and refluxed for three breathing tube, the smoke chamber into the atmosphere through the chimney. Gas hot water boiler equipped with the world famous burner, combustion using automatic adjustment, automatically adjust the water supply, the program starts, automatic control and other functions. The boiler has a compact, safe, reliable, easy to operate, installation speed, low pollution, low noise, high efficiency. Widely used in enterprises, hotels, hospitals, office buildings, civil construction and other industrial steam, life, mining and other facilities. This installation requires fast speed boiler installation, installation is very simple, the boiler does not require special ground base, only enough to withstand the ground to power. 1. Install the water supply line requires the highest level reservoir, generally not critical, the high from the ground to the reservoir tank, underground tank of water should be kept clean. Pool water outlet. For wire entrance filter water supply line. 2, the straight cross-section is mounted, the return pipe return pipe to be 0.5 meters above the bend radius should be 4 to 5 times the diameter of the pipe, the pipe should be installed at the highest automatic steam valve to prevent the steam from the pipe loop. At the same time, the general requirements of the highest level possible reliable reserve pool. When the boiler water level is below the line, the water will flow into the boiler when the next time you start. Filter wire 3 should be installed at the outlet (i.e., the inlet pipe) of the pool. Installation requires a supply line Burner fuel hose has two interfaces, and for the oil return into the oil, as long as the boiler return oil chamber and the oil corresponding feed pipe. Dedicated hydraulic system from the boiler tank to the burner pump port, an operation instruction for the burner 4 is provided. Chimney straight chimney installation requirements. The length of the chimney should not be too long, the stack height should be less than 5 meters. Chimney height should comply with relevant standards. Chimneys should be added raincap and smoke. Weight not directly on the boiler chimney host chimney 5, hydrostatic test shall be carried out after the installation of boiler water pressure test supervisor. Pressure test before proceeding to deal with internal boiler inspection, hydrostatic test pressure MPa, during hydrostatic testing, water pressure should slow down. When the pressure rises to 0.1MPa, the water pressure should be increased to 0.1MPa. When the ambient temperature is higher than 5C, hydrostatic test should be carried out; when the temperature is lower than 5, should be protected from freezing water pressure test. Hydrostatic test water is generally 20-70.6, should be as light fuel oil or gas oil (China) as the fuel, the fuel oil is generally heated to 100 deg.] C, a viscosity less 30E. Oil Qbw = 10200Kcal / kg LHV viscosity of the oil is lower than at 50 ℃ 200E, at less than about 80 ℃ 200E, 50e is less than the heat value of natural gas Qbw = 8550Kcal / kg LPG Qbw = 22000Kcal / kg.