hot selling electric steam boiler machine with ce

For heating the washing apparatus, although electric heating steam boiler is more convenient to use, but the cost is relatively high, so the cost will increase a lot, it is more economical method is to use gas steam boiler.

First, before regularly shutting down boilers and inspecting electric furnaces, the following three aspects of preparation should be done: The main contents are as follows: (1) consult the technical file of boiler retrofit electric furnace registration and understand the use of boiler retrofit electric furnace. In order to make the boiler reform electric furnace inside and outside inspection, the general need to know: boiler transformation electric furnace design, manufacturing, installation situation; boiler transformation electric furnace transformation situation; boiler transformation electric furnace operation history and use situation; Boiler retrofit electric furnace water treatment, boiler rules and regulations implementation, and so on.

2) the preparation for stopping the furnace before inspection. First, according to the maintenance schedule, the furnace shutdown date is arranged, and then the boiler revamping electric furnace is shut down according to the normal shut-down procedure, so that the furnace is slowly frustrated. The cooling method can be adopted by injecting gas to dissipate the sinking water, replacing the furnace water for cooling, and cooling by ventilation in the in-line furnace. When the temperature of the furnace water drops to 70 ℃ 80 ℃, the water can be discharged. Open all the doors. When opening the door hole, prevent warm water, steam suddenly spurts out to burn people. The steam, feed water and sewage pipes in the furnace are separated from the corresponding pipes in the boiler revamping furnace in operation. The baffle used for partition should be strong enough to avoid being bulged out by high pressure media. Break position Clear instructions should be given. The flue which is connected with other boiler revamping electric furnaces should also be reliably separated. In addition, it is necessary to remove the soot and scale on the heating surface of the boiler retrofit electric furnace.

3) preparation of inspection tools and lighting. In order to ensure smooth inspection work, inspectors should prepare the necessary instruments, tools, gauges and safe and reliable lighting.

Recently, Beihai City, Guangxi Province, issued a notice of Beihai City in Spring 2019, the comprehensive management of tackling air pollution control action program (hereinafter referred to as "Notice"), mainly for the further implement the State Council "to win the Battle of Blue Sky three-year action plan" " Guangxi tackling air pollution control three-year operational plan (2018-2020 years) "and" Guangxi 2019 spring tackling air pollution control comprehensive management action plan "to complete the Beihai tackling air pollution control tasks and achieve the 2019 goal of improving the quality of atmospheric environment.

First, the key tasks

1, and comprehensive utilization of straw Jinshao special action. County area to develop and implement straw Jinshao work program, refinement department, streets, towns, villages regulatory responsibility, the implementation of "fixed, regular, fixed people, will be responsible for" management and control, establish full coverage, no dead ends grid of the regulatory system, full use of the overhead video, satellite remote sensing, unmanned aerial vehicles inspections, straw burning a variety of means to closely monitor the information grid monitoring platform. Strengthen the inspection of law enforcement inspection, severely crack down on open burning of straw behavior. Increase efforts to promote comprehensive utilization technology of straw, conditional county incentives to take subsidies. Focus on sugarcane crop leaf prohibiting the work, in accordance with the principle of territorial management, the development of sugar cane leaves prohibiting management program, to strengthen the unified management, unified utilization, unified treatment and disposal. Municipal Agricultural Bureau, the Municipal Office of the sugar industry to strengthen guidance and support for the comprehensive development of the use of sugar cane leaves, the full implementation of mechanized harvesting of sugarcane, sugar cane fields and comprehensive utilization of straw has broken.

2, urban dust comprehensive management of special operations. The urban dust control content into the focus of supervision and improve the system of dust control mechanisms, the establishment of the construction site with information technology platform construction, water conservancy projects, the implementation of dynamic site inventory management. Supervise the implementation of the site around the site enclosure, stockpiling cover, wet earth excavation work, the main road hardening, cleaning out the vehicle, sediment transport vehicles sealed "six percent", temporarily unable to start construction land should be covered. The construction site dust pollution prevention and control into the "civilized construction" category management, dust control costs are included in the project cost; according to the law will not be in place of harmful dust management information into the construction market credit management system, in serious cases, be included in the construction market players " blacklist". Rinse vigorously promote road sweeping mechanized operations, improve road mechanized cleaning of urban built-up area. Sediment transport, coal, ore, gravel and other transportation vehicle is not confined to do, strictly punished according to law.

3, industrial enterprises air pollution comprehensive management of special operations. According to Beihai City "scattered pollution" inventory accounting, to further improve that standard and rectification requirements, classification of promoting the "messy dirty" business regulation, focusing on remediation of the city and the surrounding "messy dirty" business. Strengthen the coal-fired boilers (including biomass boilers) and brick, ceramics and other industries industrial furnaces supervision, strengthen law enforcement. Encryption of iron and steel, building materials, nonferrous metals, thermal power, cement, brick, calcium carbonate and other business materials (waste) storage, handling, crushing, transportation and other aspects of the inspection frequency of inspections, strict implementation of consecutive daily penalties, limited production shutdown and other means strictly according to law penalties for environmental violations. Focus sessions focused their attention on the process of pollution, thermal power, steel, cement, bricks, ceramics, wood processing, sugar high emission enterprises, especially in built-up urban area of ​​business, and strictly control the total amount of air pollutant emissions.

Industrial hot selling electric steam boiler machine with ces, electric, industrial steam boilers offer much quote how much? Although natural gas steam boiler is mainstream, but as many local companies still need electricity steam boiler. So, in industrial production, there are still many places need to use electric steam boilers that do not have a specific price of industrial enterprises to fast boiler consulting industrial electricity steam boiler. In this regard, the pre-sales engineer fast boiler after a detailed understanding of the needs of the industrial enterprises to provide current data capacity, there is the production of steam required tonnage, so, to be able to be used for the enterprise the tonnage of the most accurate accounting, for which data fast boiler pre-sales engineer is given the industrial enterprises 2t electric steam boiler on it. The current price of the fast boiler models at around 180,000.