propane boiler size calculator

The basic criterion gas propane boiler size calculator operation is safe and stable, how to ensure the safe operation of the boiler, boiler room need to start from the construction and operation of the boiler, specific requirements are as follows: 1, boiler room enough to stay safe passage, and, to be taken outside the boiler door apart manner; 2, the boiler room is provided to the gas leak detection devices, the time monitoring operating conditions of the gas; 3, the boiler room is arranged to meet the fire safety requirements; 4, the boiler operating temperature and pressure can not be too high; 5, gas boiler the water level must not run too high or too low, to be controlled within a predetermined range.

Box Group in their own development, bearing in mind the social responsibility, personally, set an example, to carry forward traditional Chinese virtues. We hope that through this way, to get more attention of the community. We work together to build a healthy growth of childhood for the children, to give them a future full of faith!

What precautions (1) Note that before the propane boiler size calculator cleaning before pickling to confirm the nature of the scale, thickness and range; (2) pickling work must be carried out under the guidance of experienced technical staff, and the pickling solution through repeated appraisals, and develop practical pickling solution. (3) Regardless of the use of corrosion inhibitors are inevitably produce some corrosion on the boiler, the pickling is not a panacea, not multiple uses. (4) pressure drum member if cracks or other leakage defects, these defects must be clear prior to pickling, or pickling descaling allowed. (5) pickling, the operator should wear protective equipment, (anti-acid gloves, plastic aprons, masks, glasses, etc.), open doors and windows to enhance ventilation to avoid bodily harm. Prohibited welding, smoking or open flames access in the workplace to prevent hydrogen explosion causing personal injury and other losses. Smooth discharge of gases produced (6) should be pickling boiler feed water pump, and a steam outlet pipe sewage reliably isolated with a blind plate, opens drain valve, pickling. (7) Pickling temperature should be controlled at 5 degrees is appropriate. (8) pickling process findings and laboratory data must be carefully recorded. No operator of pickling technical experience, we must make the necessary technical training in advance, after passing the examination, to conduct independent operations.

Fluidized Bed

At the bottom of the boiler furnace there is a bed of inert material. Bed is where the coal or fuel spreads. Air supply is from under the bed at high pressure. This lifts the bed material and the coal particles and keeps it in suspension. The coal combustion takes place in this suspended condition. This is the Fluidized bed.