12 bars three pass boiler bught by slovakia

As one of the food processing industries, meat processing plants are indispensable for the use of steam 12 bars three pass boiler bught by slovakias. In the food processing plant, the raw materials need to be heated and cooked to mature, and the high temperature is required to sterilize the meat products and the sterilization of the production equipment, which requires steam to be supplied by a steam boiler. The ZG boiler fast-loading biomass steam boiler uses carbon-neutral biomass fuel. The use of a variety of advanced technologies can provide high-quality steam for food plants. The boiler has high thermal efficiency and low pollution emissions.

Beijing SL Pharmaceutical Co., Ltd. as China's key high-tech enterprises, has great influence in the pharmaceutical industry. In early 2017, two-Heron relevant person in charge to get in touch fast 12 bars three pass boiler bught by slovakia, double-Heron Pharmaceutical according to demand, our company to provide a 1-ton split steam condensing steam boiler, and is responsible for subsequent transportation, installation and commissioning work .

Installation of electric heating steam 12 bars three pass boiler bught by slovakia gauge of important electric heating steam boiler applications in industrial production and daily life is very broad, but because it belongs to pressure equipment, safety is very important, so essential to gauge the role can not be ignored! So many when customers purchase electric heating steam boiler, pressure gauge choice should be included. Heating steam boilers, each computer must be equipped with a pressure gauge drum (potshell) directly connected to the vapor space, the pressure gauge should be installed in the following areas: 1 before the feedwater control valve; 2 Xingmei separable. outlet;. 3 and between the main steam superheater outlet valve; 4. boiler start separator; 5. DC soda boiler system before the primary valve; 6 forced circulation boiler water circulating pump out pot, inlet; 7 reheat. a device inlet; use electric heating steam boiler gauge shall meet the following requirements: 1 less than the rated boiler steam pressure of 2.5MPa, the pressure gauge with an accuracy not less than 2.5; the rated steam pressure of greater than or equal to 2.5MPa. the accuracy of the boiler, the pressure gauge should not fall below 1.5. 2. The pressure gauge should be selected according to the working pressure. Gauge dial scale limit should be 1.5 to 3.0 times the working pressure, zui good choice twice. 3. The size of the dial gauge should ensure fireman art can clearly see the pressure indicator value, dial diameter not less than 100mm. Selection of the gauge shall meet the requirements of the relevant technical standards, its calibration and maintenance should be consistent with national metrology department. Pressure gauges should be verified before use and indicate the date of the next check. It should draw the red line indicates the working pressure gauge on the dial. We should seal the gauge calibration. When electric heating steam boiler gauge of the following circumstances, should stop using: a finite staple stop when no pressure gauge, the rotation of the pointer is not limiting, the staple at the back; not limiting, in the absence of the staple gauge pressure. from the zero position of the pointer value exceeds a predetermined allowable error gauge. 2. The surface of the glass broken or blurred dial scale; 3. damaged seal or exceeds the expiration date check;. 4 in the table pointer leaks or jitter; 5. Other defects affect an accurate indication of the pressure gauge. Electric heating steam boiler gauge installation should meet the following requirements: 1 pressure gauge should be installed at a convenient location to observe and purged, and should prevent affected by high temperature, freezing and vibration; 2 gauge steam should be set solid. there trap. When the trap steel tube with an inner diameter not less than 10mm. It should be fitted between the connecting tube pressure gauge with electric heating cylinder steam boiler three-way valve, in order to purge the line, unloading change, checking the pressure gauge. Three-way valve in the vapor space should be mounted between the pressure gauge and the pressure gauge trap.

How steam 12 bars three pass boiler bught by slovakia operation? Rules applicable to a range of operation of the steam boiler. 2.1 2 content steam boiler process equipment is high-pressure container, the operator must be well-known structures, explanation of the boiler performance and design, operation and obtain operating permits for technical examination in order to operate independently, it must be dressed labor duty products. 2.2 before ignition, each coping member ---- boiler display instrument, an electrical circuit, valves, cocks, pipes, water meter, pump, nozzles and various safety devices according to the procedure to check and confirm that no abnormal situation and leakage It may be started. Closing the hole in advance 2.3 Check the flue, the furnace and no foreign matter before proceeding. 2.4 start, programmed to check that the following do work: water meter; operation of water supply apparatus; low water cutoff operation; action pressure switch; pressure proportional control action; safety valve operation. 2.5 boiler blowdown should be run periodically (once per shift principle), blowdown, or prohibition hand hammer striking thereof with the drain valve opened, flushing water table once per shift. 2.6 boiler operation, the operator leaves his post allowed, when inspection tour should (in general a half-hour inspection, inspection records for one hour). 2.7 inspection tour should wear gloves, can not be touched with bare hands touch the heat conductive member, observe combustion furnace to wear protective glasses. 2.8 alarm has not met Ming, endless self-control or alarm malfunction, the scene was invalid or could not process should be shutdown immediately and report to the leadership process. 2.9 Where any of the following conditions should be treated immediately shutdown a) vapor pressure rises above the pole position, although the strengthening of water supply, steam safety valve has been ruled out, but the pressure continues to rise. b) serious water shortage c) the water level decreases rapidly (although the water supply, but still down) d) water gauge, pressure gauge, safety valves to malfunction. e) the furnace wall is damaged, a large number of smoke f) water supply equipment failure. g) the furnace leaking joints, deformation of the steel sheet, blister or crack is found. h) boiler full of water through drainage is still down. When the rear portion of i) the combustion flue found to have severe, or other polar operator safety risk. j) sudden onset of severe soda steam boiler or furnace Priming severe vibration. 2.10 into the furnace needs repair, you must shutdown before proceeding to cool to room temperature and adequate ventilation, cooling and insulation must take compulsory measures should only be approved by the leadership in case of emergency, and a person responsible for work safety monitoring . 2.11 chain boiler operation, its vapor pressure, air pressure, temperature must not exceed the specified pressure. 2.12 without permission not allowed to remove or destroy any safety valve, safety valve can not be automatically excluded from the operation of steam, shall report to the leadership of the exhaust valve with an artificial lift, and good maintenance. 2.13 When the general lack of water, they should be immediately "called water" tests, such as when the Department of severe water shortages, shutdown should be an immediate ceasefire to stop the water, such as the Department is not serious water shortages, slowly, a small amount of water, but must be strictly monitoring changes in a variety of instruments. 2.14 When shutdown when a cease-fire, before the air pressure drops to zero, the fireman can not leave their posts. 2.15 slag to be cleaned regularly, focused on targeted stacking. 2.16 boiler system must be checked to confirm a variety of instruments, alarms, safety devices intact, correct, sensitive before shift change. 3 Record 3.1 "fireman shift recording."