bagasse 71 5ton h steam boiler

northeast region is dominated by poor calorific coal with low calorific value,

this type of hot water boiler just makes use od this, and it can play a role in

Anyang City Power Supply Bureau as a unit in charge of the sale of electricity in Anyang City, in the choice of the boiler is more cautious. Based on our understanding and trust, choosing our split condensing bagasse 71 5ton h steam boiler. Anyang Power Supply Bureau responsible person to us feedback, provide fast side of the boiler with the rest assured, product design everything, we believe that the fast side of the boiler can be used for more than 10 years and even 20 years. --customer feedback

Automatic inspection apparatus setpoint temperature, the temperature must be higher than the boiler. Now you run Olin burner according to adjust the selection button at the first stage and second stage fire fire, of course, we should check whether the correct steering of the blower motor, check the air pressure switch set value, the damper block from servomotor lid plate removed, checking the position of the cam switch is correct, the closed position of the damper flap, the position of the first section of the fire damper flap, Sec fire off solenoid valve contacts, the fire damper gear Sec position of the plate.

After opening the boiler winter operation, we can see a lot of red fluffy black slag deposited on the bottom of the drum and the collection box, also seen in the sheet-like water residue adhered drum, water wall tubes and smoke collector the inner wall of the box.